District Heating Building
Silandro, Italy
A simple stone sleeve, realized with the same stone of the place put into the gabbions; it translates in a modern language the traditional construction-system of the building built with stone and no plaster of the val venosta.
- Architects
- Markus Tauber Architectura
- År
- 2008
- Projektstatus
- Built
Relaterede projekter
Magasin
-
-
Ugens Bygning
The Three-Body Problem: Trapped in a Wave Sandwich
Eduard Kögel, Scenic Architecture Office | 13.04.2026 -








