Massimo Dutti Head Offices

Carrer Montserrat, 17, Tordera, Barcelona, Spanien

The new Massimo Dutti office of the INDITEX Group has a rectangular floor plan, 220 metres long and 62 wide, completing its geometry with two rounded corners and generating three opaque façades with a few openings, and a completely glazed north-facing façade. The ground floor is a large outdoor entrance space that is open but sheltered, and floors one and two are laid out in the form of a lengthwise strip of service spaces, grouping together vertical communication shafts. Three courtyards provide natural light to spaces that need it, such as offices or meeting rooms. The north strip is an open-plan space, 35 metres wide and 220 long, for product design and development. The south-facing strip situates the building’s main communication nucleus at its centre, optimizing layouts. This nucleus consists of a triple-height foyer with open stairways and lifts. The space receives daylight through a large south-facing opening on the ground floor and a skylight in the roof floor. The rest of the southern strip lays out parts of the brief that need partitioning, such as visiting rooms, showrooms, a pilot shop, e-commerce, etc.

Architekten
GINA Barcelona Architects
Jahr
2013
Projektstatus
Gebaut

Dazugehörige Projekte 

  • Gymnasium Schulstraße
    Kronaus Mitterer Architekten
  • GROHE Water Experience Center
    D’art Design Gruppe GmbH
  • Limmatquai 4
    Kästli Storen
  • Volksschule Erlaaer Schleife
    Kronaus Mitterer Architekten
  • Ortsdurchfahrt Domat/Ems
    Luminum GmbH

Magazin 

Andere Projekte von GINA Barcelona Architects 

Barcelona biomedical research park
Barcelona, Spanien
Vitam' Parc
Neydens, Frankreich
Can Framis Museum
Barcelona, Spanien
Bus depot in Horta
Barcelona, Spanien
Camp-Salou International School
Salou, Spanien