Airport Berlin Brandenburg Willy Brandt

Flughafen Schönefeld, Berlin, Germany
Visualization © Björn Rolle

Changes in Berlin’s airports in 2012 will see the present main international airport Tegel closing and a new Berlin-Brandenburg Airport opening. The spine of the new airport is a central axis of parallel takeoff and landing systems on an east-west alignment. The main access fea-tures are arranged accordingly. The new passenger terminal consists of a main hall and adjoin-ing pier buildings. It is divided into two levels, separating arrivals and departures on the land-side. The main level is Departures, designed as a spacious, light-filled hall spanned by a filigree steel-and-glass roof. With its articulated facades and clear, geometrical shapes, the terminal incorporates architectural features from Schinkel to the Bauhaus.

Competition
1998 – 1st Prize

Design
Meinhard von Gerkan and Hubert Nienhoff with Hans-Joachim Paap

Co-operation
gmp Architekten
with JSK International

Client
Flughafen Berlin-Schönefeld GmbH

Construction period
2008–2012

Gross floor area terminal and satellite
600,000 m²

Visualization © Björn Rolle
Visualization © Björn Rolle
Visualization © Björn Rolle
Visualization © Björn Rolle
Photo © Alexander Obst/ Marion Schmieding/ Berliner Flughaefen
Architects
gmp · von Gerkan, Marg and Partners Architects
Year
2012
Project Status
Under Construction

Related Projects 

  • Centro Studi Canavée
    Soliman Zurkirchen Architekten
  • Moos
    playze
  • Reiters Reserve Premium Suites
    BEHF Architects
  • Erweiterung und Instandsetzung Hallenbad Altstetten
    MIYO Visualisierung
  • Neubau von fünf Einfamilienhäusern
    Bäumlin + John Architekten ETH/SIA

Magazine 

Other Projects by gmp · Architekten von Gerkan, Marg und Partner 

Stade de Luxembourg
Luxembourg, Luxembourg
Hyparschale Magdeburg
Magdeburg, Germany
New headquarter extension for Gebr. Heinemann
Hamburg, Germany
Lingang New City
Lingang New City, China
Isarphilharmonie/Hall E
München, Germany