MOKO
Construction of a family home (timber frame construction having reutilised the existing wooden structure)
- Arquitectos
- CBA Architects
- Ano
- 2006
- Status do projeto
- Built
Projetos relacionados
Revista
-
-
-
A Construção da semana
The Three-Body Problem: Trapped in a Wave Sandwich
Eduard Kögel, Scenic Architecture Office | 13.04.2026















